• High Quality Trolley Locomotive Tunneling Mining Locomotive
  • High Quality Trolley Locomotive Tunneling Mining Locomotive
  • High Quality Trolley Locomotive Tunneling Mining Locomotive
  • High Quality Trolley Locomotive Tunneling Mining Locomotive
  • High Quality Trolley Locomotive Tunneling Mining Locomotive
  • High Quality Trolley Locomotive Tunneling Mining Locomotive

High Quality Trolley Locomotive Tunneling Mining Locomotive

Type: Locomotive
Structure: Locomotive
Material: Iron
Material Feature: Locomotive
Certification: ISO9001:2008, ISO9001:2000, CE
Energy Saving: Energy Saving
Samples:
US$ 4999/Piece 1 Piece(Min.Order)
| Request Sample
Customization:
Manufacturer/Factory & Trading Company

360° Virtual Tour

Diamond Member Since 2023

Suppliers with verified business licenses

Shandong, China
to see all verified strength labels (18)

Basic Info.

Model NO.
CJY1.5/6
Warranty
1 Year
Color
Red
Customized
Customized
Condition
New
After-sales Service
1 Year
Product Name
Product Name
Track Gauge
600/762/900mm
Speed Regulating Mode
IGBT
Application
Mining Transportation
Supply Voltage
250V
Braking Mode
Electric Brake
Braking Method
Electrical Brake Method
Transport Package
Wooden Case
Specification
CJY1.5/6
Trademark
Mingko
Origin
Shandong
Production Capacity
100set/Month

Product Description

Introduction of Coal Mine Overhead Line Tunneling Trolley Transport Locomotive Explosion Proof Locomotives For Sale

1.5 tons mining electric locomotive
The traction voltage of the 1.5-ton trolley locomotive is divided into two types: 100V and 250V, and the speed is adjusted by resistance. Its structure has two kinds of inner frame and outer frame.
Features:
stable and flexible operation, easy operation, less maintenance and easy repair. Brake brake is adopted, and the braking effect is good

High Quality Trolley Locomotive Tunneling Mining Locomotive
Specification
 
Model Wight
Ton
Track gauge
(mm)
Traction
KN
Speed
km/h
Max traction
KN
DC voltage
V
CJY1.5/6.7.9G 100V(B) 1.5 600
762
900
2.55 4.54 3.68 100
CJY1.5/6.7.9G 250V(B) 3.24 6.6 3.68 250
CJY3/6.7.9G(B) 3 600
762
900
4.704 9.1 7.36 250
CJY3/6.7.9G(B) 5.74 7.5 7.36
CJY6/6.7.9G250V(SB) 6 600
762
900
11.94 10 14.7 250
CJY6/6.7.9GY(B)
CJL/6.7.9G(B)550V 550
CJY7/6.7.9G(B)250V 7 600
762
900
13.05 11 17.2 250
CJY7/6.7.9G(B)550V
CJZ7/6.7.9G(B)
15.09 550
CJY10/6.7.9G(B)250V/550V 10 600
762
900
15.09 11 24.5 250/550
CJY10/6.7.9G(B)250V/550V
CJY10/6.7.9G(B)250V/550V 18.93 10.5
CJY14/6.7.9GY(B) 14 600
762
900
26.68 12.87 34.3 550

High Quality Trolley Locomotive Tunneling Mining Locomotive
Choose Other Model

Narrow track wire type industrial and mining electric locomotive series
 
High Quality Trolley Locomotive Tunneling Mining Locomotive
High Quality Trolley Locomotive Tunneling Mining Locomotive
1.5 Ton                                                                                                                                        3 Ton 
High Quality Trolley Locomotive Tunneling Mining Locomotive
High Quality Trolley Locomotive Tunneling Mining Locomotive
5 Ton                                                                                                                                        7 Ton 
High Quality Trolley Locomotive Tunneling Mining Locomotive
High Quality Trolley Locomotive Tunneling Mining Locomotive
5 Ton                                                                                                                                        7 Ton 

High Quality Trolley Locomotive Tunneling Mining Locomotive
High Quality Trolley Locomotive Tunneling Mining Locomotive
Packing & Delivery
 
High Quality Trolley Locomotive Tunneling Mining Locomotive
High Quality Trolley Locomotive Tunneling Mining Locomotive
 
High Quality Trolley Locomotive Tunneling Mining Locomotive
High Quality Trolley Locomotive Tunneling Mining Locomotive

Company Profile

High Quality Trolley Locomotive Tunneling Mining LocomotiveHigh Quality Trolley Locomotive Tunneling Mining LocomotiveHigh Quality Trolley Locomotive Tunneling Mining LocomotiveHigh Quality Trolley Locomotive Tunneling Mining LocomotiveHigh Quality Trolley Locomotive Tunneling Mining Locomotive

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now

You Might Also Like

Diamond Member Since 2023

Suppliers with verified business licenses

Manufacturer/Factory & Trading Company
Number of Employees
52
Year of Establishment
2022-03-03